Electric Car Purchase and Establishment of an Electric Car Station

Contract Number
94027
MSRC Award
$175,000.00
Project Background

Contractor purchased electric vehicles to be given to selected commuters to drive between the Metrolink stations and their homes. Cars will be re-charged at the newly established charging stations at the Metrolink terminals during the day readying them for the evening commute. The charging stations were installed at the Chatsworth and Sylmar Metrolink stations.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

487275.00

Project Implementation

Sylmar and Chatsworth, in the San Fernando Valley, were the sites for this project. It was anticipated the commuters would drive an average of 30 miles from home to train and return. Neighborhoods within that 30 mile radius would benefit from the reduced emissions.

Project Results Description

It is estimated that the substitution of electric vehicles for conventional automobiles in the commutes to the Metrolink station will result in Non-Methane rganic Gas (NMOG) reduced by 22.5 grams per day, Carbon Monoxide (CO) reduced by 306 grams per day, and Nitrous Oxide (NOx) reduced by 36 grams per day.

Project Status Description

Construction information on the EV charging stations, training of the EV drivers, and conversion data on the vehicles involved.

Project Year
1993
Summary Approved
No
Total Project Cost
$487,275.00
Co Funding Amount
$0.00
Project Category
Contractor Address
P. O. Box 111
Contractor Agency
Los Angeles Department of Water and Power (LADWP)
Contractor City
Los Angeles
Contractor Contact
John Schuman
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
94027
Contractor Zip
90051
Co Participants
Los Angeles County Metropolitan Transit Authority (LACMTA), Los Angeles Department of Transportation (LADOT), "Electricar, Solar Electric".
Final Approval Date
Final Report Approved
No